We have performed part of concreting and finishing works of 15 separate 2 to 4 storied buildings having 4 flats at every story and totaling 72 flats in either 90 m2 or 120 m2 each. The construction also included 6 villa type houses of 220 m2 each and a swimming pool as well as a restaurant. The total construction area was around 14.000 m2. This was the very small part of one of the most prestigious projects of Turkey having the budged of almost 1.5 Billion US$ and investment financed by German Steag Group.

 

  • Building (Headquarters) Construction

    1.800 m2 Building was handed over only with concrete and roofing works finished...

  • Hospital Construction

    Complete renovation of a 24.000 m2, existing building into a 400-bed hospital (5 operating theatre), including civil, HVAC and electrical works...

  • Hotel Complex

    Hotel complex project includes design, land survey and execution as well as equipment and partial furnishing...

  • Silo Building Repair

    Renovation of an existing silo building in Corum Cement Factory which was damaged by earthquake...

  • Uliuk Spinning Factory Construction

    Civil, mechanical and electrical works of a 8.000 m2 spinning factory...

  • Underground Gallery Construction

    900 m long, 5mx5m gallery construction...

  • Tashkent Dedeman

    We have performed part of finishing works as well as furniture supply for the Dedeman and Boghchul Hotels...

  • Yumurtalik Housing Complex

    We have performed part of concreting and finishing works of 15 separate 2 to 4 storied buildings having 4 flats at every story and totaling 72 flats in either 90 m2 or 120 m2 each...

  • Water Pipeline Major Repairs

    The project owned by Ministry of Agriculture and Water Resources in Uzbekistan...