Oeno-MAC
Perşembe, 9 Mayıs 2024

Oeno-MAC

Oeno-MAC Multi-Actor-Cooperation training at all level for integrated sustainable development of the European viti-vini sector from the vineyard to the glass

 

Is an LdV VET project, aims at developing (design, development, test, validation, dissemination, promotion, guidance) innovative vocational training approaches, materials and tools to the integrated agro-food Sector "from the grape to the glass" based on the MAC environment. (Multi-Actor-Cooperation. involving all actors at all levels.)

 

The Oeno-MAC coaching solution primarily provides tools and training materials to the trainers/technicians/intermediairies to train and coach the farmers (Vine aspects), the Wine producers and the health or innovation actors in relation to Wine and Vine sectors. 5 key topics which have been chosen to build the Oeno-MAC coaching solution are: Vine cultivation: exchange of good practice and varieties; Wine production + recent changes in regulation and techniques; Bottling, labelling and other containers; Health, gastronomy and safety; and Business and rural developments. These topics are also mapped against identified European job profiles and an EQF (European Qualification Framework) approach. Modules, training materials, etc. are also defined to fit with the design of a European Credit system in Vocational Education and Training (ECVET) related to these job profiles and EQF approach.

 

  • Building (Headquarters) Construction

    1.800 m2 Building was handed over only with concrete and roofing works finished...

  • Hospital Construction

    Complete renovation of a 24.000 m2, existing building into a 400-bed hospital (5 operating theatre), including civil, HVAC and electrical works...

  • Hotel Complex

    Hotel complex project includes design, land survey and execution as well as equipment and partial furnishing...

  • Silo Building Repair

    Renovation of an existing silo building in Corum Cement Factory which was damaged by earthquake...

  • Uliuk Spinning Factory Construction

    Civil, mechanical and electrical works of a 8.000 m2 spinning factory...

  • Underground Gallery Construction

    900 m long, 5mx5m gallery construction...

  • Tashkent Dedeman

    We have performed part of finishing works as well as furniture supply for the Dedeman and Boghchul Hotels...

  • Yumurtalik Housing Complex

    We have performed part of concreting and finishing works of 15 separate 2 to 4 storied buildings having 4 flats at every story and totaling 72 flats in either 90 m2 or 120 m2 each...

  • Water Pipeline Major Repairs

    The project owned by Ministry of Agriculture and Water Resources in Uzbekistan...

TEXT_SIZE